The Global Transmission Build-Out in Numbers
Market Data · Grid Expansion Worldwide · ~8 min read · Updated Oct 2026
We fabricate transmission towers for projects on several continents, and every enquiry starts with the same question from the buyer's side: is the market real, or is it another forecast? Forecasts are cheap. So instead of writing one, we went through published national plans, lender project files and the IEA's investment data, and collected what is actually funded and under construction. Every number below points to a public source.
The bottleneck, in three numbers
Three figures from the IEA's World Energy Investment 2025 report frame every grid project tendering anywhere this year.
- USD 400 billion. Global grid investment in 2025, a record, after 9 percent growth in 2024.
- USD 0.40. What the world spends on grids for every dollar spent on new generation. In 2016 it was USD 0.60. The wires are being outspent by the plants they have to carry.
- 1,650 GW. Solar and wind capacity waiting in connection queues worldwide at the end of 2024, about six times Germany's entire generating fleet.
The same report shows what this does to suppliers: cable procurement now runs two to three years, large power transformers up to four, HVDC systems more than five. Cable prices have nearly doubled since 2018, transformer prices are up about 75 percent. A fabricator's quoted lead time and its ability to hold a price are worth more than they were three years ago.
India: USD 110 billion and a ten-year plan
India approved USD 110 billion of transmission investment for 2024 to 2032, the largest single national commitment in the IEA report. The work is driven by renewables integration and by states that now plan their grids a decade ahead. For tower suppliers, India is simultaneously the biggest opportunity and the most price-competitive tender environment in the world.
Vietnam: nearly 29,000 km of new high-voltage line
Vietnam's revised Power Development Plan 8 (PDP8) is the most concrete plan we found. Between 2025 and 2030 the country targets 12,944 km of new 500 kV line and 15,307 km of new 220 kV line, plus about 208 GVA of new substation capacity at those two voltage classes. The Vietnam Ministry of Industry and Trade puts total generation and grid investment to 2030 at about USD 136 billion, of which roughly USD 18 billion is transmission.
One detail matters for suppliers. Vietnam Electricity (EVN) estimates the grid needs about USD 3 billion a year but can fund only about 40 percent from its own balance sheet. The rest has to come from external capital and new mechanisms, which means more internationally financed tenders, and more buyers who need a fabricator that can pass a lender's documentation audit.
Bangladesh: a four-project pipeline you can audit
Bangladesh's state transmitter PGCB publishes its project pipeline with scopes, costs and progress percentages. Four projects carry most of the current construction.
| Project | Financier | New Line | Substations | Status |
| Southern Chattogram & Kaliakoir | AIIB, USD 160M loan | 180.4 km at 132/230 kV | 4 GIS, about 1,820 MVA | About 20% built, Mar 2026 |
| Dhaka & Western Zone Expansion | ADB + AIIB, USD 200M (AIIB share) | About 408 km | 13 substations, 7,440 MVA | Closing Dec 2027 |
| Southwest Grid Expansion | ADB, about USD 360M | 105 km at 400 kV, 176 km at 230 kV | 3 at 400 kV, 2 at 230 kV | Physically complete |
| Renewable Integration, S. Chattogram | ADB, about USD 345M | 238 km at 132 to 400 kV | 10 new substations | Started Jul 2025 |
The lender files are candid about pace. The Dhaka and Western Zone project had disbursed about 17 percent of its AIIB loan after five years, and one package was re-tendered after a contractor default. Cycles are long and paperwork is heavy. But donor financing pays reliably, and a supplier whose galvanizing, testing and packing documents survive an audit is worth more to an EPC bidder than the cheapest number on a spread of ten quotations.
Africa: Mission 300 and the wires behind it
The World Bank and the African Development Bank have pledged about USD 48 billion through 2030 to connect 300 million people to electricity under Mission 300. By June 2026 the programme had connected over 50 million people across 40 countries, with USD 15 billion committed and USD 4.5 billion mobilised in co-financing. Tanzania alone added 7.5 million connections, Ethiopia 4.6 million, Nigeria 4.5 million.
Much of that connection depends on new wire. The same institutions approved a USD 1.6 billion West Africa Regional Electricity Market Program built on the Ghana to Cote d'Ivoire interconnector and a Mauritania transmission corridor. Grid expansion at this scale is tower demand, spread across dozens of small-to-mid-size tenders rather than one flagship project.
The rest of the map, briefly
- Indonesia. The IEA estimates about 58 GW of inter-island subsea transmission capacity by 2050, led by 25 GW between Sumatra and Java, to move power from the islands where the sun and wind are to the island where the demand is.
- Chile. The country announced its longest transmission line to date, to connect remote renewables by 2029.
- China. One fifth of global grid investment, growing 10 percent a year, though mostly served by domestic mills.
What this means if you are buying or supplying towers
Read the plans together and the pattern is clear. The 132 to 230 kV classes carry most of the kilometres in South Asia and Africa. The 400 and 500 kV backbone is new business in Bangladesh, Vietnam and Chile. Financing increasingly comes from lenders who audit documents as hard as prices. And the global component squeeze means a realistic delivery schedule is now a tender criterion, not a detail.
If you are preparing a bid against any of these pipelines, send us the tower schedule. We fabricate 10 kV to 500 kV, we hold quoted prices through long procurement cycles, and our export documents are built for lender inspections. Our transmission towers page shows the range and the specification table.
Worth remembering: the demand is not a forecast. It is a set of funded projects with kilometre counts attached: 28,000 km of new high-voltage line in Vietnam alone, a ten-year USD 110 billion plan in India, four auditable projects in Bangladesh, and a USD 48 billion access programme across Africa. The suppliers who win there are the ones whose paperwork survives the same audit as their steel.
Sources
Every figure above comes from one of these public documents:
- IEA, World Energy Investment 2025 — global grid investment, connection queues, supply chain lead times, India and China figures
- ASEAN Centre for Energy, PDP8 and RUPTL policy insight — Vietnam's 500/220 kV line and substation targets, Indonesia's inter-island needs
- World Bank, Mission 300 milestone release (June 2026) — connection counts and committed financing
- PGCB project database — Bangladesh project scopes, costs and progress
- AIIB project monitoring reports, Southern Chattogram & Kaliakoir (March 2026) and Dhaka & Western Zone (January 2026) — AIIB website, Bangladesh portfolio
Progress figures move and plans get revised. Check the linked sources for the latest status before you rely on any number in a bid.