The Factory Behind the Towers

Founded 1994 · Hengshui, Hebei, China · 67,000 m² · ISO 9001 & ISO 14001
Steel tower fabrication workshop with CNC plasma cutting line and overhead cranes

China Summit Iron Tower Manufacturing Co., Ltd. is a steel tower factory in Hengshui, Hebei Province, about 250 km south of Beijing. We have been fabricating towers since 1994, first under the name Hebei Zhufeng Iron Tower and now also exporting as China Summit. Everything we ship is made to customer drawings for EPC contractors, utilities, network operators and tower trading companies.

We are a manufacturer, not a trading company. When you send a drawing query, the person who answers it walks past the machine that will cut that part. That matters most during production, when a drawing question usually has a deadline attached.

1994Manufacturing since
67,000 m²Factory site
96Production machines
50,000+Tonnes per year

What We Manufacture

Three product lines run through the same workshops, on the same drawing-driven process:

How a Tower Moves Through the Plant

Every order follows the same six stages. Each one leaves a record that ships with the goods:

  1. Material in. Structural steel arrives with mill test certificates, checked against the order before it enters the workshop.
  2. Cutting. CNC plasma cutting sets member length and end angles.
  3. Marking, punching and drilling. Holes are made to drawing dimensions so parts assemble without reaming on site.
  4. Welding. Welded assemblies are made to qualified procedures and inspected before galvanizing.
  5. Hot-dip galvanizing. All carbon steel parts are galvanized; coating thickness is measured and recorded.
  6. Trial assembly and packing. Towers are trial-assembled on the ground, then packed as coded sets with their bolts.
Why this matters to your site crew: coded set packing means one bundle per tower position, with the bolts inside. Erection teams open the bundle for that tower and start assembling instead of sorting loose steel at the site gate.

Workshop and Equipment

Three production workshops cover 28,000 m² on the 67,000 m² site, holding 96 units of production equipment. The machines that decide tower quality:

CNC bending machine forming steel plate for tower sections
CNC bending machine
CNC submerged-arc welding machine welding tubular tower sections
CNC submerged-arc welding
Angle steel production line punching and marking tower members
Angle-steel production line
Fabrication workshop interior with overhead cranes and plasma cutting table
Workshop with plasma cutting line

The Laboratory

An in-house laboratory handles the chemical and physical testing that tower contracts require: steel composition and mechanical properties, fastener strength and galvanizing coating thickness. Samples come off the production batch, not from a showroom shelf, and the reports travel with the shipment documents.

In-house physical and chemical testing laboratory
In-house laboratory for chemical and physical material testing.

People

265 people work here, 108 of them engineers and technicians. For a buyer this shows up in two places: drawing queries get answers with numbers in them, and production problems get solved in the workshop the same day instead of being emailed back and forth for a week.

Who We Supply

Domestically, our towers carry the networks of China Mobile, China Unicom, China Telecom and China Tower, plus power utilities, broadcasting, civil aviation and public security projects across more than 30 provinces. Exports go to Southeast Asia and Africa, with documents prepared for the destination market.

Company Facts

ItemDetail
Founded1994 (renamed Hebei Zhufeng Iron Tower Co., Ltd. in 2005)
LocationHengshui City, Hebei Province, China
Registered capitalCNY 101 million
Total assetsCNY 186 million
Factory area67,000 m² site, 28,000 m² workshops (3)
Annual capacity50,000+ tonnes of steel structures
Employees265 (108 engineering and technical)
Management systemsISO 9001 quality, ISO 14001 environmental, occupational health & safety
LicencesSteel structure qualification; power and communication tower production licences
MarketsChina (30+ provinces), Southeast Asia, Africa
What we do not do: we are not an EPC contractor and we do not design the line. We fabricate from your drawings, or from your line design data if you need us to detail the towers. Where a project calls up an EN 1090-2 execution class, we state our current FPC status in the quotation instead of assuming it.

Visit or Audit the Factory

Come and see the line running, or send your third-party inspector. We will also take you through the laboratory and a trial assembly while you are here.

Plan a Factory Visit
Or contact us directly: +86 198 6888 8177 · [email protected]