How We Check Towers Before They Ship

Six inspection points · In-house laboratory · Records ship with the order · Third-party inspection welcome
In-house laboratory for chemical and physical material testing

A tower that assembles badly on a mountain site costs more than the price difference between two quotations. So inspection here is not one final look before the container closes. It runs through six points, from the day the steel arrives to the day the container door is sealed, and each point leaves a written record.

6Inspection points
85 µmMin coating, ≥6 mm steel (ISO 1461)
ISO 9001& ISO 14001 certified
100%Galvanized carbon steel

The Six Checkpoints

StageWhat we checkWhat you get
1. Steel intakeGrade, thickness and mill certificates against the orderMill test certificates, batch-matched
2. Cutting & drillingMember length, end angles, hole positions to drawingParts that bolt up without reaming on site
3. WeldingQualified welding procedures; visual inspection before galvanizingWeld records on request
4. Dimension & trial assemblySample towers assembled on the ground; bolt fit checkedTrial assembly photos on request
5. GalvanizingCoating thickness measured on production piecesCoating thickness records per batch
6. Packing & markingMembers coded to the erection drawing, bolts packed per tower setCoded packing list matched to drawings
The point of records: if a dispute comes up a year later, nobody argues from memory. The batch number on the mill certificate traces to the galvanizing record, and the coded packing list traces members to the tower position on your erection drawing.

Galvanizing Standards We Work To

All carbon steel parts are hot-dip galvanized. The coating class is agreed in the contract; the two standards our export customers reference most:

Steel thicknessISO 1461 minimum local thickness
≥ 6 mm85 µm
≥ 3 mm to < 6 mm70 µm
≥ 1.5 mm to < 3 mm55 µm
< 1.5 mm45 µm

Where the project specification calls up ASTM A123 instead, that is what the coating is measured against. Either way the measured values are recorded, not estimated.

Documents That Travel With the Order

Commercial documents (invoice, bill of lading, certificate of origin) are coordinated with your nominated freight forwarder.

Third-Party Inspection

Inspection by SGS, Bureau Veritas, TUV, Intertek or your own engineer is welcome, and we prefer it booked at order stage rather than after production. That way the visit lands on a trial assembly or a galvanizing batch instead of an empty workshop. We provide the workspace, lifting and re-test access the inspector needs.

Put this in the inquiry: whether TPI is required, at which hold points, and against which standard. It changes the production schedule and the price, so saying it up front gets you an accurate number instead of a change order later.

Company Certifications

CertificateScope
ISO 9001Quality management system
ISO 14001Environmental management system
Occupational health & safetyWorkplace safety management
Steel structure qualificationChinese fabrication qualification for steel structures
Production licencesPower transmission towers and communication tower products

Certificate copies are available on request. Where a project calls up an EN 1090-2 execution class, the fabricator must hold a valid Factory Production Control (FPC) certificate: state this at inquiry stage and we will confirm our current FPC status in writing in the quotation rather than assume it.

Your Inspection & Test Plan

Many EPC contracts come with their own ITP. Send it with the order. We map each of your inspection points to our production stages, agree witness and hold points in writing before production starts, and record results in your format where the formats differ. This is routine work for us, not a special request.

Frequently Asked Questions

What certificates does the factory hold?

ISO 9001 quality management, ISO 14001 environmental management and occupational health & safety certification, plus a Chinese steel structure qualification and production licences for power and communication tower products. Certificate copies are available on request.

Can we inspect the towers before shipment?

Yes. Third-party inspection by SGS, Bureau Veritas, TUV, Intertek or your own inspector is welcome. Book it at order stage so the visit is planned around trial assembly and galvanizing dates.

What galvanizing coating thickness do you guarantee?

The class is agreed in the contract. Where ISO 1461 applies: 85 µm minimum local thickness for steel 6 mm and above, 70 µm for 3 to 6 mm, 55 µm for 1.5 to 3 mm. ASTM A123 is applied where specified. Measured values are recorded and shipped with the order.

Which documents ship with a tower order?

Packing list, steel mill test certificates, galvanizing coating thickness records, dimensional inspection records and erection drawings, plus trial assembly and loading photos on request.

Can you follow our inspection and test plan?

Yes. Send your ITP with the order. We map your points to our production stages and agree witness and hold points in writing before production starts.

Have an ITP or an Inspector?

Send the inspection and test plan with your drawings. We will come back with the mapped hold points alongside the quotation.

Request a Quote
Or contact us directly: +86 198 6888 8177 · [email protected]